Sector: Health & Fitness
Location: Chertsey, Surrey
Timescale: Six weeks
Budget: £120,000
Brief: Complete reconfiguration and refurbishment of both male and female changing rooms, to include shower areas and toilets.
345 completed the following on this project:
- Stripping out of existing floors; ceilings; sanitary ware; shower cubicles; shower fittings and lockers.
- The lockers and shower cubicles had to be retained and reutilised within refurbished and relocated areas.
- Installation of new floors and ceiling tiles
- Installation of new lighting throughout
- Installation of new toilet cubicles and sanitary ware.
- Installation of bespoke joinery and glazing
- All works had to be carried out within a fully operational health club, requiring the creation and installation of temporary changing and shower facilities within the lounge area of the club.